Proposed change to East Shore Drive - 1927
The road - as it was on the early plat maps:
|
The 1927 proposed change. |
Sometime after the 1922 plat map - the road in this following area - changed
dramatically - the map found proposing it is dated 6 Oct 1927 if it is read correcly in the
lower right hand corner. The white is the original road and the yellow is the proposed change. |
|
The area thats was often refered to as "Vonnegut's Row" |
|
|
Perry's Point aka Peru Point |
1927 - Nov 2 - Porperty Owners To Pave Part of East Side Road
Have Bought Right of Way and Donated It to the County
Straightens Road
Will Go From Artillery Barn to Hollyhock Corner; To Be Finished by Summer
Paving of the East Eide road is to vecome a reality!
For years the lack of good roads around the lake has been bemoaned by all those who travel them, ad for years
efforts have been made to secure a hard surface road, but to no avail
But now the ball is finally rolling and a start will be made. While this strip will be but 1149 feet in length, it is
hoped that it will set a precedent that will result in the ultimate goal - a paved road around the lake.
The stretch that is to be paved first will start at the Artillery barn of the academy where the school's new road
will end, thence past K. K. Culver's property, where it begins an angle over to the Hollyhock or Vonnegut
cottage.
This will be paved with an eighteen foot surface of probably Kyrock, with a forty foot right of way.
This land has all been donated by the property owners concerned and the cost of paving will also be paid for by
them. It will propbably be the first road in the county that cost the county nothing.
The road will eliminate the dangerous corner at the Kittle cottage as well as giving the cottagers along that stretch
adequate property at the rear of their cottages . Traveling along the road will also be much safer to say nothing of
the pleasure or riding on a hard surfaced road
The move must come befure the county commissioners in December for official sanction and the final signing to
contracts.
It is planned to have the new road finished by the time the heavy summer traffice starts, and sooned if possible
The property owners who have aided in his solving the East Side Road problem include
Laura M. Culver,
George Vonnegut ,
Maud F. Wolfe,
Mrs. Bernard Vonnegut ,
Mrs. Emma S Vonnegut ,
George Mueller,
L. V. Bergman,
John S. Kittle,
Norman Perry,
Mary H. Waterman,
Susan E. Perkins,
Walter Vonnegut
Irene Bogardus
The transcaction has been handled by W. O. Osborn who has been at work on the proposition for over two
years, and who has spent much time in bringing about this community benefit.
1928 - May 23, - Workmen Clear Way For East Side Road
To Hard Surface
William O'Conner gerts contract to re-route and pave with Kyrock
Actual work on re-routing the East Side Road has started and workimen are busy clearing away brush and
trees preoperatory to grading the new roadway. The road is to extend from the Hollyhocks corner on the
present road to a point east of the arsenal onf the to-be--paved Road 10.
Wiilliam O 'Conner has been aarded the contracyt at $32,000. for the 5947 feet. Kyrock has been chosen
as the surfacing material. The raod is to be eighteen feet in width with wide berms and the right of way
ranges from forty to fisty feet. The roadway is to widen at the point it joins State ROad 10 so as to
eliminate the danger of a sharp turn; It is expected the roard will be competed about October 1.
This re-routed road will eliminate several sharp and dangerous corners ans well as a bad hill.It will
provide a paved road from the Hollyhocks corner in to Culver without a break, which is good news to
those who have had to travel the rough sketched on the East SIde Road for m any years. It solves
an aggravating problem that has faced those interested in the community for many years, an dit is hoped
that it is the beginning of a paved road that will finally circle the lake.
Years later it seems there was a question of
lake access from St Rd. 117 at Aubbee Bay.